Yuchen electrical power tramsmission supply all the sprocket
Merchandise Description
one. American CZPT, CZPTpean CZPT, Japanese CZPT
two. Pilot bore, concluded bore, taper bore and specific bore CZPT
3. CZPT area and large precision
four. Advanced warmth treatment method and surface area therapy crafts
five. Much better top quality and aggressive value.
6. Content C45(1045), reduced carbon steel, 40Cr, 20CrMnTi, stainless metal this kind of as SS316L, SS316, SS304, SS420, copper etc. CZPT
seven. CZPT sea deserving deal to CZPTpe and American
8. High pace digital gear hobbing devices to ensure the teeths quality
nine. Corrosion resistance treatment method CZPT
10. Control on tolerance and simple to put in
eleven. Great materials and good therapy to make sure long lifestyle span
12. OEM/ODM welcome
Item display
Manufacture process
Organization sort | Maker & Exporter |
Main export industry | CZPTpe, North and South The usa, Southeast Asia, CZPTia, Middle East, Africa |
Materials | C45, minimal carbon steel, 40Cr, solid iron, stainless steel, copper and so on |
Manufacturing strategy | Cast and then machined, hobbed, if want can also weld |
Heat remedy | High frequency quenching and so on |
Area treatment | Oxide black, Galvanized, Nickel plated, Chrome plated, Sandblasting, Painted and so on |
Model | Type A & Type B, Single, CZPT, Triple – 35B10-80,40B9-90,50B9-90,60B9-ninety,80B9-90,100B9-90,120B9-80,140B10-sixty,160B10-6006B10-a hundred twenty five,08B9-a hundred twenty five,10B9-125,12B9-one hundred twenty five,16B9-125,20B9-114,24B9-ninety,28B9-seventy six,32B9-76, and other sprocket to in shape with conveyor chain, transmission chain |
Packing | Plywood Case/Pallet |
FAQ
Q1. What is your phrases of packing?
A: CZPTly, we pack our goods in single coloration box. If you have special request about packing, pls negotiate with us in progress, we can pack the items as your ask for.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% prior to supply. We’ll display you the photos of the goods and packages
just before you shell out the harmony. Other payments phrases, pls negotiate with us in advance, we can discuss.
Q3. What is your phrases of delivery?
A: EXW, FOB, CFR, CIF.
This fall. How about your supply time?
A: CZPTly, it will just take twenty five to 30 times right after receiving your progress payment. The specific delivery time depends
on the objects and the amount of your get.
Q5. Can you generate in accordance to the samples?
A: Yes, we can generate by your samples or technical drawings. We can develop the molds and fixtures.
Q6. What is your sample coverage?
A: We can offer the sample if we have ready elements in inventory, but the clients have to pay the sample cost and
the courier expense.We welcome sample get.
Q7. Do you test all your goods before shipping?
A: Yes, we have one hundred% test before shipping
Q8: How do you make our business long-expression and very good relationship?
1. We preserve very good good quality and competitive value to make certain our buyers benefit
2. We regard each consumer as our buddy and we sincerely do organization and make friends with them,
no issue in which they come from.