SAE 1541 Cold Drawn Seamless Mechanical Tubing

SAE 1541 Cold Drawn Seamless Mechanical Tubing

Part I: Solution INTRODUCTION
one. Description: 
Mechanical tubing is a sort of steel tube widely utilized automotive industry, engineering area, as well as machinery parts. Common specification of mechanical tubing is ASTM A519, covering carbon steel gardes and alloy metal grades. 

2. Commodity: SAE 1541 Chilly drawn seamless mechanical tubing

three. CZPT specification: ASTM A519, BS6323-4, CZPT specification.

4. Available metal quality: Different carbon metal and alloy metal grades such as but not restricted to the subsequent:

ASTM A519: SAE1571,SAE1571,SAE1026,SAE1045,SAE1518,SAE1524,SAE1541, SAE4130,SAE4140,SAE4145,SAE4340,SAE8620
BS 6323-4: CFS3,CFS4,CFS5,CFS7,CFS8,CFS9,CFS10,CFS11
EN/DIN: ST35,ST45,ST52,E195,E235,E355,C35E,C45E,25CrMo4,34CrMo4,42CrMo4,

five. Size selection:

OD: upto 356mm
ID: upto 300mm
W.T: not minimal

six. Manufacture strategy: Cold rolled, Chilly drawn, CZPT cold drawn

7. Delivery Issue:

BK BKW BKS GBK NBK Q+T
+C +LC +SR +A +N
Cold rolled Cold drawn Tension relieved Annealed Normalized Quenched+Tempered

8. Conclude finish: basic finishes with square cuts,bevelled finishes.

9. CZPT export packing: in bundles tied with steel strips. Interior and external oil coating. Exterior packing by PVC bags and knit bags.

ten. CZPTized packing or marking are CZPT upon ask for.

MECHANICAL TUBING WITH THICK WALL: 

MECHANICAL TUBING WITH Quality 4140 Q+T:

MECHANICAL TUBING With out Warmth Treating:

Portion II: Frequently Questioned Queries
1. MOQ: 
three-five tons/dimensions for carbon steel grades, ten-twenty tons/size for alloy metal gardes.
2. Shipping and delivery Time: twenty-thirty days for carbon steel mechanical tubings, thirty-50 times for alloy steel mechanical tubings.
3. Guarantee&Ensure: Warranty&guarantee period of time is 6 months considering that we provide the tubes, and we are not accountable for quality problem induced by improper unloading or storage after shipment. We welcome customer’s inspection just before shipment. 
4. Payment Approach: We accept payment technique like T/T, L/C, or D/P, but it is dependent on our investigation about clients. We have a solution to evaluate the credit rating of buyers from all over the world, and time and amount of D/P we can launch is identified by the evaluation. 
5. Good quality Manage: We purchase raw substance from steady suppliers who are foremost metal mills, and we inspect the raw materials as for every the specifications. Throughout our manufacturing procedure, there is inspection and quality manage in every phase.

Component III: Company INTRODUCTION
We are a manufacturer of cold drawn, chilly rolled, and hydraulic chilly drawn metal tubes with OD upto 356mm because 2002. Covering an region of about 32000M2, we have twelve regular workshops with  2 hydraulic cold drawing benches, 4 chain chilly drawing benches, and 2 ERW mills. Our facilities handles all the generation techniques from pickling, cold drawing,warmth dealing with,noticed slicing, straightening,inspection,packing to further machining &turning, chilly drawing die fabrication, and products repairation&maintenance.

Factory Visual appeal:

Uncooked Substance Inventory:

Chilly DRAWING DIE WAREHOUSE:

HYDRAULIC Chilly DRAWING:

Heat Dealing with FURNACE:

MULTI-ROLLER STRAIGHTENING:

STRAIGHTENING BY Push:

Saw Chopping:

 

SAE 1541 Cold Drawn Seamless Mechanical Tubing